Preconstruction. Escrows required for taxes, insurance, working capital (2%-4% of the loan), and initial operating deficit. Balances will be released to borrower after 6 consecutive months of break-even operations. Post-Construction. Escrows required for taxes, insurance, and MIP and capital needs replacement reserves (minimum $250 per unit/annually).